Sample to Mass Production: The 9-Stage OEM Launch Roadmap

Plan your seasonal product rollout with our verified 45–60 day sample-to-delivery OEM production timeline.

Chude Technology6 min read

Phase 1: Technical Scope & Sample Dispatch (Days 1–10)

Selection of base hardware platform, confirmation of AC socket standards, and dispatch of evaluation golden samples for buyer bench testing.

Phase 2: OEM Customization & Packaging Proofing (Days 11–25)

Laser logo engraving proofs, custom LCD screen firmware graphics, and retail gift box die-line approvals.

Phase 3: Pilot Run & Full Mass Production (Days 26–50)

Automated SMT PCB manufacturing, cell spot-welding, assembly, 100% 3-cycle burn-in aging, final OQC inspection, and ocean container loading.